DTRO / STRO Leachate Treatment Process Flow Chart

Issuing time:2023-07-15 14:54

Process Flow Chart of DTRO+STRO Containerized Leachate Treatment System



1-DTRO  STRO 滲濾液處理工藝流程(英文).png

All above processes can meet the leachate discharge standards.




Leachate Treatment Process for MSW Incineration Sites

  • The balance tank and grid sand-sedimentation tank mainly remove silt in the original filtrate and homogenize and equalize the feed water.

  • Anaerobic UASB mainly removes pollutants such as COD, with a removal rate of 75%-90%.

  • MBR mainly consists of denitrification tank, nitrification tank, and an external ultrafiltration system, mainly removing ammonium nitrogen (with a removal rate of 99%) and the remaining COD from leachate.

  • The biological pre-treated effluent enters the DTRO/STRO membrane system. The DTRO/STRO system consists of high pressure STRO/DTRO membrane modules.

2-焚燒場垃圾滲濾液處理工藝(英文).png



Leachate Treatment Process for MSW Landfill Sites

  • The balance tank and grid sand-sedimentation tank mainly remove silt and homogenize and equalize the raw water.

  • The hydrolysis tank mainly improves the biodegradability of the leachate.

  • MBR consists of denitrification tank, nitrification tank, and an external ultrafiltration system, which is used to remove ammonium nitrogen (with a removal rate of 99%) and the rest COD from leachate.

  • The biological pre-treated effluent enters the DTRO/STRO membrane system. The DTRO/STRO system consists of high pressure STRO/DTRO membrane modules. The DTRO/STRO membrane system can achieve water production rate of over 80% and reach different effluent standard.


3-填埋場垃圾滲濾液處理工藝(英文).png